A risk analysis is needed when works can affect the safety of an electrical installation or the continuity of supply. The typical case is work carried out in the proximity of networks that are in operation. The analysis is useful on public projects with traffic, site organisation and multiple utilities. The network operator can ask for additional safety measures, documented through a risk analysis.

Risk analyses
We identify the technical and operational risks of works carried out next to electrical installations and formulate control measures for permitting, site work and operation.
ANRE context
The risk analysis complements coexistence studies and technical documentation whenever the works can affect the safety of the installations or the continuity of supply. It is useful to operators, authorities and clients who have to document their preventive measures.
What this service solves
The risk analysis identifies the scenarios that can affect the safety of the electrical installations or the continuity of supply and establishes the technical and organisational control measures.
01
Input
We establish the activities, the neighbouring assets and the risk scenarios.
02
Analysis
We assess the probability and the severity of the impact.
03
Documentation
We propose technical, organisational and monitoring measures.
04
Permitting
We fold the conclusions into the coexistence or construction documentation.
When it is needed
- A risk analysis is needed when works can affect the safety of an electrical installation or the continuity of supply.
- The typical case is work carried out in the proximity of networks that are in operation.
- The analysis is useful on public projects with traffic, site organisation and multiple utilities.
- The network operator can ask for additional safety measures, documented through a risk analysis.
Documents to start from
- A risk analysis starts from the site plans and from the details of the site organisation.
- The data on the electrical installations in the area of the works is required.
- The technical methodology or the phasing shows what is built and in which order.
- The health and safety requirements and the permitting conditions complete the starting set.
Main deliverables
- The client receives the risk matrix for the works, with the scenarios assessed.
- The analysis includes the preventive measures plan.
- The recommendations for working near electrical installations are set out.
- The annexes are prepared for permitting and for the site documentation.
Decisions it settles
- The analysis shows which risks condition the permitting.
- It establishes the measures that are mandatory during construction.
- It states the responsibilities and the checks to run before work starts.
The ANRE framework used as reference
The references below are used to orient the process. The specific conditions are confirmed for every project with the network operator and with the documents applicable at the date of the request.
Frequently asked questions about Risk analyses
Talk to an engineer
We review your request and follow up with the next steps
Phone
+40 755 869 569
[email protected]
Headquarters
Costea Vodă St. 20, 1st floor Valea Adâncă, Miroslava, Iași County, Romania
On Google
Find the office, get directions, or leave a review.
View on Google Maps